热门标签

皇冠博彩:GCAP completes 309.28 KWp solar PV systems

时间:1个月前   阅读:5

皇冠博彩www.hg9988.vip)是皇冠体育官方博彩平台,开放皇冠信博彩代理申请、博彩会员开户的线上博彩的官方平台。

G Capital Bhd executive director Datuk Yap Yee Ping

KUALA LUMPUR: G Capital Bhd’s (GCAP) 70%-owned subsidiary, Solarcity Malaysia Sdn Bhd has completed the installation and commenced operation of a 309.28 KWp Solar Photovoltaic electric power generation system (Solar PV System).

The solar PV is for the supplemental power purchase agreement (PPA) with Muda Paper Converting Sdn Bhd, a wholly-owned subsidiary of Muda Holdings Bhd inked on May 30.

,

足球免费贴士www.ad168.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的足球心水网。

,

"I’m pleased to witness the completion and commissioning of 309.28 KWp add-on to Muda Paper Converting. All these small yet crucial delivery of promises will help Malaysia in reaching the target set in Renewable Energy Transition Roadmap 2035,” executive director Datuk Yap Yee Ping said in a statement.

The plant will be contributing revenue and earnings to GCAP over a span of 25 years from Aug 19, 2022, the commercial operation date.

“With the completion of the 309.28 KWp solar PV systems in Simpang Ampat, this brings our total installed solar PV systems capacity to 15.6MWp inception-to-date,” Yap said.


转载说明:本文转载自Sunbet。

上一篇:竞彩推荐(www.99cx.vip):Apex court can act on written submissions without oral ones

下一篇:足球博彩分析:LIVE: Najib sent to prison after appeal rejected

网友评论